PEA


Preliminary Economic Assessment

PRELIMINARY ECONOMIC ASSESSMENT ON THE BOKAN MOUNTAIN RARE EARTH ELEMENT PROJECT, NEAR KETCHIKAN, ALASKA
EFFECTIVE DATE: JANUARY 10, 2013

Prepared by

Edwin H. Bentzen III, RM SME
Hassan Ghaffari, P.Eng.
Les Galbraith, P.Eng.
Richard F. Hammen, Ph.D.
Ronald James Robinson, P.Geol.
Sabry Abdel Hafez, Ph.D., P.Eng.
Srikant Annavarapu, RM SME

 

Download (PDF – 7.6 mb)

 

Appendices:

Appendix B – Assay Quality Verification

Appendix C – Assay Sample Spreadsheet

Appendix D – Bulk Densities

Appendix E – Mining Report

Appendix F – Process Flowsheets

Appendix G – WasteWater Management

Appendix H – CAPEX Summary

Appendix I – OPEX Summary